Borders Leisure Trust gives Tweedbank a make over for 2014

Tweedbank Athletics Track gets major refurbishment Sports Labs play key role in project:

Tweedbank a strategically important track in the Border was originally opened The track was built in about 1984 and was upgraded from 6 to 8 lanes in 1996, constructed by Charles Lawerence Surfaces it has served the Borders athletics clubs very well over the years. A quick make over 2 years ago did not prove to prolong the life of the facility therefore a decision was made to refurbish the track in May 2013.

Working with Stuart Davidson a local architect Sports Labs prepared a specification for the works and sought tenders for the refurbishment for works to commence in May. The initial site investigation was very positive and was proven to be correct in that the track was originally built to a high standard. During the works the quality of the install was monitored by key stage inspections so throughout a regime of sampling and testing was exercised.

The end result is now an upgrade on the potential for this track to host top Scottish events in the future. With Scotland hosting the 2014 Commonwealth Games Tweedbank will no doubt feature in warm up and training facilities for attending Nations.

WP_20131118_025WP_20131118_030

WP_20130903_002WP_20130924_023

image

Borders press reported on the benefits of the project to the community in a recent article which you can read here;